PadHaus

How we deliver

From first consultation to handover in 12 to 14 weeks.

Six steps. We handle construction, manufacture and installation. You hold the contract with PadHaus from deposit to handover and for ten years thereafter.

  1. 01

    Consultation

    Week 0

    45 minutes, online or at your site. We discuss the site, the brief, and the legal route. You leave with a route map and an indicative price.

    Book a consultation →
  2. 02

    Configuration

    Weeks 1–2

    You configure your model in our online configurator, or with your consultant. We send a fixed-price specification and a draft contract.

    Open the configurator →
  3. 03

    Site survey

    Week 3

    Our surveyor and architect attend your site. Measurements, services check, photographic record. We confirm the Class 3A exemption applies to your site at this point.

  4. 04

    Paperwork

    Weeks 3–6

    You give the planning authority 14 days' written notice under Class 3A, and an independent professional submits your building control paperwork. We do not handle planning applications, so we contract only for planning-exempt installations.

  5. 05

    Manufacture

    Weeks 4–10

    Built in our manufacturing partner's facility. We send weekly photographic updates.

  6. 06

    Installation and handover

    Weeks 10–14

    Foundations, delivery, install, fit-out, commissioning. Typically two to four days on site. We hand over with a full pack: drawings, certificates, warranty, aftercare schedule.

In every PadHaus build

Design

  • Architectural drawings
  • Floor plans and elevations
  • Services layout
  • 3D model of the dwelling on your site

Compliance

  • As-built drawings and the documentation for your building control file
  • Product, warranty and BER certificates

Aftercare

  • 10-year structural warranty
  • 5-year services warranty
  • Annual heating service
  • Written condition report each year
  • Lifetime technical support

Honest pricing

What is not included in the From price.

PadHaus prices include VAT at 13.5% and exclude foundations. Foundations vary by site — typically €4,000–€12,000 depending on ground conditions, slab type, and whether groundworks access is straightforward. We quote foundations after the site survey, not before.

VAT in the Republic of Ireland is 13.5% on construction works. Every price we publish includes VAT.

Connections to mains water, drainage, and electricity are quoted separately after the site survey, because they vary significantly by address. Some sites have services at the boundary; others require a mains extension. We will tell you which before you sign.

Book a free site survey or speak with us online.

45-minute consultations, no obligation.

Book a consultation