Frequently asked questions
Common questions.
If your question isn't answered here, book a consultation.
Pricing
The From price covers the constructed dwelling — structure, insulation, internal fit-out, kitchen, bathroom, glazing, and mechanical systems (electric underfloor and ceiling heating). It also includes architectural drawings, delivery, installation, and the ten-year structural warranty. It includes VAT at 13.5%. It does not include the concrete base, groundworks, or connections to mains services.
Foundations (typically €4,000–€12,000, depending on site conditions and soil type) and connections to mains water, drainage, and electricity. These are quoted separately after the site survey, because they vary significantly by address. We will not ask you to sign a contract before you have the full number. Published prices include VAT at 13.5%.
A deposit of 10% secures the contract. A further 40% is due to secure a place in the build programme. A further 40% is due just before the site enabling works. The final 10% is due prior to commissioning the building. No payment is requested before the contract is signed and the specification is fixed.
No. We issue a fixed-price specification with the draft contract. The price does not change unless you change the specification. We carry the material cost risk between quotation and contract — we will not ask you to pay a variation for a change you did not request.
We can quote the price of the home itself straight away, but a final cost also depends on the groundworks, which vary from site to site. Each site is different, so we inspect it to work out where the connection points to the utilities are. Utilities must be buried at specified depths below the frost line, and the electricity connection must be armoured for security. Distances, gradient and access all change the figure — so we visit before quoting a final price.
We accept bank-to-bank transfers.
Planning
It depends on the size, use, and your site conditions. In the Republic of Ireland, a non-habitable garden building (office, studio, gym) up to 30 m² is exempt under SI 600/2001 Class 3 — increased from 25 m² on 27 July 2026. From the same date, the new Class 3A exemption allows a habitable Detached Auxiliary Dwelling of 32–45 m² you can sleep in, subject to conditions. The Studio and The Residence are both a fit for Class 3A — each keeps its internal floor area inside the 45 m² ceiling. We confirm the route that applies to your site at the site survey stage.
We assess this at the site survey and tell you plainly what routes are available. In some cases, a minor site adjustment (moving the siting position, reducing the footprint) brings the project back into an exempted route.
In the Republic of Ireland, a Section 34 application has a statutory determination period of eight weeks, though twelve weeks is typical in practice. An appeal to An Coimisiún Pleanála (formerly An Bord Pleanála) adds a further four to six months.
No. Planning can be an extremely long process, which means we cannot sign a contract for an installation that is not planning-exempt.
It is a new Republic of Ireland exemption, in effect from 27 July 2026 under S.I. 340 of 2026. A Detached Auxiliary Dwelling is a habitable garden home of 32–45 m² to the rear of the main house — one you can live and sleep in, unlike a Class 3 garden building. It is for family use, linked to the main house's services, and does not require full planning permission on qualifying sites. The Studio and The Residence are both designed for this route, each with an internal floor area inside the 45 m² ceiling.
The dwelling must be 32–45 m² (counting any existing garden structures within the 45 m² cap), occupied only in conjunction with the main house, and never sold, subdivided, or short-term let. It must be built to Building Regulations, including fire safety. It is served by the main house — no separate water or wastewater connection — set at least 0.6 m from boundaries, and must retain at least 25 m² of private open space. The main house must be the owner's sole or main residence when works begin.
Yes. You must give the planning authority at least 14 days' written notice before works commence, using the statutory template. There is no application to approve and no decision to wait for — the notice lets the authority record uptake. An independent professional can prepare and submit it for you; PadHaus does not provide this advice.
No. The Class 3A exemption is time-limited: works must be completed before 31 December 2030. It is one of a set of 2026 measures aimed at making better use of existing homes and gardens.
Process
From first consultation to handover: around 12 weeks for The Studio and 14 weeks for The Residence. These timelines assume an exempted planning route such as Class 3A.
Installation is typically two to four days on site. We install the foundation, crane the structure into position, connect services, and complete the fit-out. Our team handles the full process. You are not required to be on site, but many buyers prefer to be. We hand over with a full documentation pack: drawings, certificates, warranty cards, and an aftercare schedule.
Architectural drawings (as-built), the documentation for your building control file, BER certificate, heating system warranty registration, appliance manuals, ten-year structural warranty certificate, and the first year of the aftercare programme. The opinion on compliance with the Building Regulations is issued by the independent registered professional you appoint.
On-site construction varies with the site but should take no more than a few days — the preparatory works for the concrete base and the utility connections, then the modules are craned in and connected. This is separate from the overall programme, which runs from first consultation to handover.
No. It can sound like a practical solution, but the difficulty is certification and compliance with building regulations — our quantity surveyors and engineers can only stand over work they have actually seen. Keeping the enabling works within our process is what lets us warrant the whole build.
Aftercare
Ten years structural warranty covering the frame, envelope, and roof. Five years on mechanical services (underfloor and ceiling heating, plumbing). Lifetime aftercare programme: we remain your contact for any question about the building, indefinitely.
An annual service visit to check the underfloor and ceiling heating, check the external cladding, and review seals and drainage. A written condition report after each visit. Direct phone access to our technical team for any question between visits. We want to know if something is not performing correctly before you do.
We return. No questions, no charge. The first twelve months post-handover operate under a full defects liability period — if anything is not performing to specification, we fix it at our cost. This is not unusual in the construction industry; what is unusual is that we say it plainly in the contract.
Finance
Habitable garden dwellings are a relatively new product category and lender policy varies. Some buyers use equity release on the main dwelling. Others use personal loans or construction loans. We can provide a full specification pack to support any finance application. We do not offer finance directly, and we do not recommend specific lenders.
A habitable garden dwelling built under the Class 3A exemption typically adds measurable value to a property — the addition of a legal separate living space is a strong valuation driver in the Irish market. We can provide the documentation a valuer needs. We are not valuers and cannot give a specific figure.
The home
Yes. It is a high-quality additional house located in your garden — a habitable home you can live and sleep in, not a garden room or office.
A steel frame on a concrete and rebar plinth, with an insulated base and waterproof barriers, tiled and laminate floors. The exterior is cement-fibre panels with timber cladding for aesthetics, and a timber-trussed roof with insulation, water barriers and aluminium sheeting.
Electric underfloor and ceiling heating.
Yes. Your house gets a BER certificate from an approved assessor as part of the process. Keep it with the building regulation documents and certification we supply — you will want them if you ever sell the property.
Yes. A concrete base is the best solution for long-term stability and security. It is part of the groundworks, quoted after the site survey.
Yes. It always has a kitchen, a bathroom, a dining area, and as many bedrooms as you choose, subject to the size of the unit. You can also add features such as a sauna.
Yes. The components are largely factory-built and arrive in modules and sub-assemblies that are craned onto the site and assembled. The on-site construction is the preparatory work for the concrete base, the home assembly and the utility connections. This has two advantages: the modules are built in a factory under stringent, regulation-compliant quality control; and you avoid months of traditional construction labour, noise, traffic and disruption in your garden.
Yes. The plans are an integral part of our contract with you, alongside the building regulation compliance documents and sign-offs.
Yes, and you receive a bundle of documents and certificates confirming it. These are important if you wish to sell your property in the years to come, as they prove regulatory compliance. Under data-protection rules we cannot store information relating to your home indefinitely, so you will need to retain these documents.
Yes. It has been designed to allow additions — an extra bedroom, for example — at a later date.
No. It is not a mobile home — it is a high-quality house.
Ownership, legal & tax
Not where the site and the dwelling meet every condition of the Class 3A exemption, which include that it is not sold or let separately and not used for short-term letting such as Airbnb. We confirm the route that applies to your site at the site survey stage.
Yes, though not as an Airbnb. Currently you can rent it out for a maximum of €16,000 per annum tax-free. We confirm the details that apply to your situation as part of the process.
No. These homes, technically described as domestic auxiliary dwellings, do not fall under the remit of the RTB.
No. The regulations currently do not allow the overall site to be divided for a sale of the domestic auxiliary dwelling separately from the original house.
Yes.
Yes. You will need a new Eircode to register the property for the Local Property Tax.
Book a free site survey or speak with us online.
45-minute consultations, no obligation.